The Pre Engineered Building (PEB) consists of Primary members like columns and rafters made of fabricated section made out of steel plates of designed thicknesses and secondary members like C or Z purlins and wind bracings.
The roofing will be usually with Galvanized steel plates manufactured by reputed suppliers and also with thermal insulated roofing panels. The primary members are lighter in weight compared to conventional structural steel sections
Benefits of a pre-engineered building
They are cost-effective.
They offer time savings.
They are versatile and offer architectural options
Services offered include Roof Truss and Purlin installation, Pre-Engineered Building construction, Steel Building projects, Supply and Installation of Roof Galvalume Sheets and AC Sheets, and Steel Tower construction.